Rayyan Road Project 7 Contract 2

The contract of Qatar Al Rayyan Road Construction and Improvement Project, which is the most critical of 7 huge projects that were tendered by The Public Works Authority “Ashghal”, was signed in January 2014. Roads with a total length of 10.7 km shall be constructed and improved within the scope of Al Rayyan Road Project, including main roads with a length of 5.3 km and side roads with a length of 5.4 km, and 6 junctions will also be constructed by Dogus Construction. The project is planned to be completed in 2018.

Troy Engineering has been appointed by Anel MEP as a pipeline subcontractor for the TSE Network of the project.

Network consist of :

  • 29,800 km DI, GRP & HDPE Pipeline (Ø250 mm - Ø1000 mm)
  • 42 numbers of various valve chambers

Back to Projects